I give the sump pan its first coat of paint which now rubbed down for second when weather warms up.
Striped and cleaned oil pump and filter bowl which has had a first coat of paint.
Also clean and prepped some parts for blasting - engine/gearbox mounting brackets, gearbox crossmember, tie bar and other odd items.
Also fixed the engine on to the stand - lifted into place easily and with ability to the spin the engine allows good access.
6hrs

No comments:
Post a Comment